|
 This $110 million level 5 addition to the existing
prison facility for men, included:
3 Maximum Security Buildings and 3 Super Maximum
Security (Administration Segregation) Buildings;
Housing Support Buildings; Administration Building;
Kitchen and Cafeteria; Vehicle, Laundry, Armory,
Prisoner Education Building; Gatehouse, Execution
Suite;
26,000 linear feet (4.8 miles) of security
fencing; The installation of 6 miles of razor wire;
Construction of a new central tower and an additional
perimeter tower; The installation of new security
cameras and enhanced observation points. |